| Mr wibau | 02-11-2009 | comment profile send pm notify |
|
hey did my biggest blockfill today 105 cube, loved it. hey if there is anyone out there from bayside concrete pumping out there would love too talk too you thanks. |
||
| bisley57 | 02-11-2009 | reply profile send pm notify |
|
Great pictures,good attitude about pumping all those blocks.How was the wash-out? The last picture has a mistake made by many operators I see,there is an easy alternative. |
||
| Mr wibau | 02-11-2009 | reply profile send pm notify |
|
Hey mate wash out was good cause i run silicon around my s tube. But where there was build up i got my old friend out the breaker bar. Got too love those sparks coming off thats days concrete. Hey what is wrong with the last pxt cant a operator put the box down too go take some pxt. |
||
| bisley57 | 02-11-2009 | reply profile send pm notify |
|
Potentially a 2500.00 mistake,why set the box in such a precarious spot |
||
| toper | 02-11-2009 | reply profile send pm notify |
|
dont get upset mr.wibau, weve all suffered from brain fart from time to time, but on the floor in the corner would have been a better spot |
||
| Mr wibau | 02-11-2009 | reply profile send pm notify |
|
Considering there was only three off us left on site i cant see a problem. Also the box is turned off when i put it down. And for putting it on the ground in the it was too far away this way i didnt have too bend down my back was killing me after such a lot off blockfill. |
||
| ShortStik | 02-11-2009 | reply profile send pm notify |
|
looks sunny for you. how long that take you? my favoriate was dirt soaked with oil/desil under the s-tube. you must feel like king-kong climbing around that jungle gym of a site. lol |
||



















.jpg)
.gif)









.jpg)








