Extreem line pumping. No problem for us ;-)
Dipstick 04-15-2014
comment profile send pm notify

http://youtu.be/FjHWoV1debQ

This is what we've been up to the last weeks. There is a setup like this on both sides of the fjord. This is only the beginning. From here we will poor the pillers to the bridge 65m high and than the bridge itself several hundred meters both ways.. We already used 100 bar pressure on the first poor so hope we mannage the push when the line gets realy long. If anybody needs help with a job like this than just take contact! We operate around the globe as long as the job is extreem enough for us Wink

Greeting from Dipstick. Owner of Danicon AS Cool


Dipstick 04-15-2014
reply profile send pm notify

BTW.. Our customer in this case is Kruse Smith. One of the biggest building companies in Norway. Big thanks to them for involving us in to their project. Over the next 1,5 years we will build a large bridge. 12.000m3 meters of concrete. The bridge will be over 500m long and 65m high. We will keep you all updated.


Dipstick 04-15-2014
reply profile send pm notify

Thats us yes. And we've already done one poor. 400m3 with not the slightest problem. This is easy for us. Give us twice the length and we'll call it a challange. Thanks for the nice reply Smile

 

We will be using this line at least 100 times so we like to do it propperly..


localboy 04-15-2014
reply profile send pm notify

Thats a full on job u got there, looking forward to seeing more. Repect!


biged 04-15-2014
reply profile send pm notify

I got tired just watching  walk the pipe line, those shut off switches are impressive I never seen them before, great work good looking job building the stairs and mounting the bracket that anchor the pipe.


Todd 04-15-2014
reply profile send pm notify

Long pipe job


Todd 04-15-2014
reply profile send pm notify

Here is part two.


ShortStik 04-15-2014
reply profile send pm notify

AWSOME dipstick.  that sir is a line job.  pump on!!!!!!


36m 04-15-2014
reply profile send pm notify

All I can say iS WTF!!!! Just building the stairs  down to the site is a job!  Very impressive !!


ahssci 04-16-2014
reply profile send pm notify

Can you tell me what the two red things were at the 6:20 and 9:00 minutes mark were? I am really glad we only have about 300" of line. LOL


Dipstick 04-16-2014
reply profile send pm notify

I asume you mean the closing valves. We have 3 total in this line. 2 manual hydro pump and one electric-hydrolic wich we can close from the pump. If we would get a plug you can imagin the mess and danger it would create if we could not close the line at some places. the first 200m of line goes steep down hill. 70m down to sea level. The closing valve with remote we use to stop the line from draining every time we stop the pump.

Notice the water we cross. Thats sea so the water level is not stabel. The line is on floating bridges. We mannaged to create an all steal line that can flex up and down with the water. We disconect in between poors just to be on the safe side..

The pump we use is the BSA 2109 from putzmeister. It produces 136 BAR pressure on the concrete. Cool


ShortStik 04-17-2014
reply profile send pm notify

136 BAR!!!!!  that must be one very nice mix to not seg and/or dry pack under that kind of pressure.  what kind a pipe are you guys using?


ShortStik 04-17-2014
reply profile send pm notify

BTW beautiful place to work


Dipstick 04-17-2014
reply profile send pm notify

Its a High Pressure pipe from Putzmeister.

 http://www.putzmeisteramerica.com/products/detail/putzmeister-pipe-technology-p1st-zx-125-7-1mm

All products are from Putzmeister. They are delivered by Hans Eibinger from Austria. Very good company I must say. Top quality equipment Cool